Restoring column operation in 6 weeks

Customer request:
Unstable column operation was identified. A specialist must visit the site to inspect the column and provide advice on restoring its operating conditions.
Spliteks solution:
  • Process engineer consultation and analysis of the column operating conditions
  • Specialist site visit to inspect the internals
  • Recommendations on the operation of the column internals, adjustment of the operating conditions and partial replacement of the packing
  • Expedited manufacturing at the facility in Serpukhov
  • Delivery of the batch to the customer’s site
Result
Column operation restored within 6 weeks, from the customer’s request to stable production of on-spec products.

Other Spliteks solutions

Installation
Customer request:
Manufacturing and supply of column internals for three phases of a stable gas condensate fractionation and transshipment complex at the port. Urgent supply and installation of column internals for the damaged main fractionator of Phase 2
Learn more
Integrated solution
Customer request:
Upgrading deethaniser 2/ZOK-1 to increase its capacity by 20% above the design capacity while ensuring that the total mass fraction of methane and ethane in the deethanised condensate does not exceed 0.8%:
Learn more
Replacement of obsolete equipment (column internals) dating from 1975
Customer request:
Obsolete equipment (column internals) dating from 1975 must be replaced.
Learn more
Increasing product draw-offs
Customer request:
Increasing the draw-off of the fourth vacuum side cut from column K-5 of the CDU/VDU-6 unit and improving its quality (reducing the colorimeter colour reading) while increasing the tar viscosity to approximately 300 mm²/s or higher, Improving fractionation sharpness and optimising operation of the wash section in vacuum column K-5 of the CDU/VDU-6 unit.