The equipment was manufactured, delivered and installed ahead of the contractual schedule and in compliance with the technical specification.
Installation was completed in half the contractually stipulated time, for which a letter of appreciation was received.
Following the trial run, a capacity increase of exactly 20% above the design capacity was achieved while ensuring that the total mass fraction of methane and ethane in the deethanised condensate did not exceed 0.8%.