Urgent replacement of damaged column internals

Customer request:
Urgent replacement of the damaged internals of columns K-14 and K-16 at the EP-300 unit is required.
Spliteks solution:
  • Design and engineering
  • Coordination with the manufacturers of the new column shells
  • Expedited manufacturing at the facility in Serpukhov
  • Delivery of the batch to the customer’s site


Result
Supply of column internals for two columns within 1.5 months after order placement

Other Spliteks solutions

Installation
Customer request:
Manufacturing and supply of column internals for three phases of a stable gas condensate fractionation and transshipment complex at the port. Urgent supply and installation of column internals for the damaged main fractionator of Phase 2
Learn more
Integrated solution
Customer request:
Upgrading deethaniser 2/ZOK-1 to increase its capacity by 20% above the design capacity while ensuring that the total mass fraction of methane and ethane in the deethanised condensate does not exceed 0.8%:
Learn more
Replacement of obsolete equipment (column internals) dating from 1975
Customer request:
Obsolete equipment (column internals) dating from 1975 must be replaced.
Learn more
Increasing product draw-offs
Customer request:
Increasing the draw-off of the fourth vacuum side cut from column K-5 of the CDU/VDU-6 unit and improving its quality (reducing the colorimeter colour reading) while increasing the tar viscosity to approximately 300 mm²/s or higher, Improving fractionation sharpness and optimising operation of the wash section in vacuum column K-5 of the CDU/VDU-6 unit.
Learn more

Show more

Do you have any questions?

We will provide a consultation, calculate the cost and answer all your questions